image

GF 125 kW Biomass Boiler

RHI start date: 25th April 2013 – 7 years left on RHI tariff (approx.)

Our GF125 biomass boiler model can be used for various eligible applications such as: Rural properties and workshops, drying applications (including drying wood to be used/sold as logs/wood fuel), grain drying, retails areas, factories and more.

What could you gain?*

Tier rates

Tier 1 rate = 14.19 pence per kW | Tier 2 rate = 3.72 pence per kW

Based on a 30% load factor (utilising the boiler at 30% of its peak output capacity) you could receive….

Tier 1 = £23,307.08 | Tier 2 = £6,110.10

*Please note: All the above figures are based on theoretical operation calculations.


2 x GF 210 kW Biomass Boilers

RHI start date: 12th April 2018 – 12 years left on RHI tariff (approx.)

Our 2 x GF210 biomass boilers are a hydraulically connected 420 kW system. These boilers can be used for various eligible applications such as: Rural properties and workshops, drying applications (including drying wood to be used/sold as logs/wood fuel), grain drying, retails areas, factories and more.

GlenFarrow biomass boiler

What could you gain?*

Tier rates

Tier 1 rate = 4.07 pence per kW | Tier 2 rate = 2.85 pence per kW

Based on a 50% load factor (utilising the boiler at 50% of its peak output capacity) you could receive….

Tier 1 Only = £52,410.20 (3066 Hours Tier Break)

*Please note: All the above figures are based on theoretical operation calculations.